The Alberta Energy Regulator (AER) sets the rules for building near energy infrastructure. The most important one for acreage owners is Directive 079, whose current edition took effect on May 14, 2025.
- Abandoned-well setback
- 5 m radius min.
- Directive 079 edition
- May 14, 2025
- Pipeline controlled area
- 30 m each side
- Sour gas hazard levels
- 4
Abandoned wells: invisible by design
When a well is abandoned, its casing is cut and capped one metre or more below the surface. Once the site receives a reclamation certificate, the lease notation is usually removed from title. The AER's own directive puts it plainly: at that point there may be nothing visible on the land, and nothing on the title, to show a well is there.
That is why a search matters. The AER's Abandoned Wells Map Viewer shows recorded surface locations with the licensee of record and coordinates. Since 2012, Alberta's Subdivision and Development Regulation has also required applicants to identify abandoned wells.
The setback rule
Under Directive 079, no surface structure may be built on top of an abandoned well, and a minimum 5 m setback radius around it must be maintained. The municipality may require more, and the AER encourages a larger setback and an agreed access route so the licensee can reach the well if it ever needs work. Wells drilled and abandoned to less than 150 m deep are exempt.
On a large parcel, five metres is rarely the constraint. The practical questions are where the well sits relative to the best building site, the view, the septic field and the driveway — and what the access route will need.
A closer look · Reading the property
What is underground needs its own file.
Land that looks clear can still carry infrastructure and access obligations.
Open the detail ↗- 01
Search the records
Identify recorded wells and pipelines affecting the parcel and nearby proposed work, using the relevant provincial records.
- 02
Read the instrument
A registered right-of-way or surface agreement describes rights and obligations that a line on a picture cannot explain.
- 03
Confirm before disturbing ground
Use the applicable locate and operator processes before excavation or construction. A map is not a clearance to dig.
How to use this illustration
The pictured corridor and well are conceptual. They do not locate infrastructure or show a safe excavation area.
Read with the guide sources: Alberta Energy Regulator · Alberta Energy Regulator.
Explore the technical schematic
Pipelines and rights-of-way
A pipeline's controlled area extends 30 m on each side of the pipe, measured from the centre of the outermost line. The right-of-way itself is usually narrower. Work inside the right-of-way — or within 5 m of a pipe with no designated right-of-way — requires the licensee's written consent, a locate and supervision. Fencing, a new approach, a dugout or a shop pad near a line all count.
Rights-of-way are registered on title. Read each one: its width, who holds it, and what it permits the holder to do.
Sour gas setbacks
The AER classifies sour gas facilities into four hazard levels based on release rates, pipeline release volumes and hydrogen sulphide content, each with a predetermined setback. Municipalities do not permit development where people will live within a setback, and industry and planning authorities have used the same guidelines since 1979. If a parcel is near a sour gas well or line, ask the county how the setback affects building sites.
Surface leases and the Tribunal
Mineral rights in Alberta are usually held separately from the surface, so an operator may hold the right to enter land it does not own. Surface leases set out access and annual compensation. Disputes over right of entry and compensation go to the Land and Property Rights Tribunal, which since June 2021 has combined the former Surface Rights Board, Land Compensation Board, Municipal Government Board and New Home Buyer Protection Board.
When you buy land with an active lease, the lease — and its payments and obligations — usually comes with it. Ask for the agreement, the current payment and the operator's contact.
Take it to the property
Your wells & pipelines checklist.
A practical starting point for the conversations and documents behind this acreage.
0 of 5 checked
General information. Confirm the parcel's conditions with the relevant county or qualified professional.
Alberta Luxury Acreages · Dusko Sremac, REALTOR® · 403-988-0033
https://albertaluxuryacreages.ca/field-guide/wells-pipelines-and-surface-rights/
Sources: Directive 079: Surface Development in Proximity to Abandoned Wells (May 2025) — https://static.aer.ca/prd/documents/directives/Directive079.pdf
Abandoned Wells Map Viewer — https://maps.aer.ca/awm/index.html
Working around oil and gas pipelines — https://www.aer.ca/providing-information/by-topic/pipelines/working-around-oil-and-gas-pipelines
EnerFAQs: Explaining AER setbacks — https://www.aer.ca/understanding-resource-development/enerfaqs-and-fact-sheets/enerfaqs-setbacks
Land and Property Rights Tribunal — about — https://www.alberta.ca/land-and-property-rights-tribunal-about
From the guide to the property file
Registered constraints: what to keep, what to ask.
Compare the actual instrument and mapped location with the places you intend to use. Record who has confirmed the location and which activity you have asked about.
- A statement you may hear
- A map shows a nearby facility
- The question behind it
- Has the parcel and proposed activity been reviewed with the appropriate authority or operator?
- Record the answer
- Keep the document, its date, who reviewed it and the next action together. Missing evidence stays open; a checked box is not an approval.
Add it to the due-diligence file
Planning framework added October 1, 2026. Read the official source material below for the technical requirements.
How Dusko uses this
Dusko searches the regulator's well map for every acreage he lists, so buyers see the answer in the property file rather than discovering it during conditions.
Questions buyers ask
How close can I build to an abandoned well in Alberta?
No structure may be built on top of an abandoned well, and AER Directive 079 requires a minimum 5 m setback radius around it. The municipality may require more. Wells drilled and abandoned to less than 150 m deep are exempt.
Source: Directive 079: Surface Development in Proximity to Abandoned Wells (May 2025)
How do I find out if there is an abandoned well on a property?
Search the Alberta Energy Regulator's Abandoned Wells Map Viewer, which shows recorded surface locations with the licensee and coordinates. Don't rely on a site visit or the title: abandoned wells are capped one metre or more below the surface, and the lease notation is usually removed from title after reclamation.
Source: Abandoned Wells Map Viewer · Directive 079: Surface Development in Proximity to Abandoned Wells (May 2025)
What is a pipeline controlled area in Alberta?
A strip 30 m wide on each side of a pipeline, measured from the centre of the outermost pipe. Work inside the right-of-way, or within 5 m of a pipe with no right-of-way, needs the licensee's written consent, a locate and supervision.
Can I build a house near a sour gas facility in Alberta?
Not within its setback. The AER sorts sour gas facilities into four hazard levels, each with a predetermined setback, and municipalities do not permit development where people will live inside a setback. Ask the county how any nearby facility affects building sites.
Who handles surface rights disputes in Alberta?
The Land and Property Rights Tribunal handles right of entry and compensation. Since June 2021 it has combined the former Surface Rights Board, Land Compensation Board, Municipal Government Board and New Home Buyer Protection Board.